Today Andrew came over and attached a 2″ LB to the side of my main panel, I pulled the smaller wires into it, tomorrow he will return to hook the 2/0 main wires into it, and the ground. When that’s done we should be ready for a rough in and a service inspection. After that we get electricity. I’ve also mounted a few lights on the trusses for temporary light, they look good.